top of page
IMG_2848.jpg

BMW M4 Tin Top Correction & CSL

We really enjoyed this one! Hot old day too... This new client came to us after recommendations from a previous customer, His M4 was looking a little tired/scratched up and generally dull. After having to reschedule on what was the only wet & windy day for weeks! We eventually got round to sorting this out, a weekend spent on this beut got her swirl free and coated with CSL & C2 ready for some roof down driving for the remainder of summer.

Site Title

IMG_2715.jpg
IMG_2706.jpg
IMG_2713.jpg
IMG_2707.jpg
Snow foam to remove any light surface contamination.
IMG_2723.jpg
IMG_2721.jpg
Then a full bodywork wash by hand before moving on to the clay bar to remove any bonded contaminates.
Not to forget a thorough clean round all badges with soft bristle brushes.
IMG_2724.jpg
All four wheels given a full decontamination and wash down by hand before a final rinse down of all external areas. ( For clarification we do often utilise old washmitts for wheels, we don't cross contaminate) 
IMG_2719.jpg
After fully drying the paintwork ( with a brand new towel ) , it was time to fully mask all areas including glass and trims.
It was then on to the two stage polishing process using the trusty Rupes and a selection of pads.
IMG_2762.jpg
Plenty of progress being made! 
IMG_2764.jpg
IMG_2760.jpg
IMG_2761.jpg
IMG_2800.jpg
Nasty scratch on the front bumper, parts had gone pretty deep however mostly removed! 
After a full panel wipedown C1 was used to seal all external areas, along with C5 on all wheels
IMG_2802.jpg
We then pulled the car into the sun to inspect our work and check for any marring.
IMG_2860.jpg
IMG_2726.jpg
After removing all polishing dust it was time for a wipe down of panel wipe before Gtechniq application.
IMG_2781.jpg
IMG_2803.jpg
IMG_2783.jpg
After finishing off any fiddly bits it was time for a generous coating of G1 on ALL glass surfaces.
IMG_2805.jpg
IMG_2804.jpg
Exhaust tips polished and sealed for added effect.
IMG_2793.jpg
IMG_2794.jpg
Gtechniq C2 used on all wheels and T2 on tyres to finish.
IMG_2734.jpg
IMG_2862.jpg
After around 30 hours we were left with the below and what a transformation! 
IMG_2836.jpg
IMG_2834.jpg
IMG_2850.jpg
IMG_2859.jpg
IMG_2853.jpg
IMG_2851.jpg
IMG_2875.jpg
IMG_2839.jpg
IMG_2855.jpg
IMG_2821.jpg

Click below for similar work...

13.jpg
bottom of page